Job Description
Prime contractor with over 2500 miles of new build fiber in Tallahassee, Florida. Must Be able to complete all aspects of aerial construction, including but not limited to: Anchors, Transfers, Strand, Fiber, Bonds, Payable line items include, but not limited to: strand, fiber, anchors, down guys, overlashing, make ready transfers, bonding, etc.
Bottom package and drive off
99% of poles are accessible from a bucket
Optimal crew size is 4 people per crew with a bucket truck and pickup truck. Crews will be responsible for providing and documenting traffic control as needed.
Estimated completion date August 2022
Current crews completing 3000-7000 ft per day
Please contact us to find out about our partner program, enhanced rates good through 12/31/21.
Below rates are for 1 crew, 30 day pay, enhanced rates for three crews or more are available. Also quicker pay terms are available.
Place 6M strand $0.47
Lash fiber any size on new strand $0.85
Overlash to Existing fiber $0.85
Lash Fiber 432ct $0.94
Place Down Guy for 6M strand (includes Guy Guard) $11.28
Place Screw Anchor – 6000 lbs $42.30
Place Guy Guard (Included in Down Guy) $0.00
Place up to a 4 in. Riser Guard $18.80
Place Aerial Dielectric Self-Supporting cable $0.00
Place Cable extension Arm Long $28.20
Place Cable extension Arm Short / Sidewalk guy arm $23.50
Tree Trimming $28.20
Resag cable $32.90
Delash/relash $0.55
Dead end Pole Transfer $61.10
Straight thru Pole Transfer $42.30
Bonding aerial strand $1.88
Place aerial slack loop coil $32.90
Figure 8 cable for Underground Dip in Aerial Route under 144 fiber $32.90
Figure 8 cable for Underground Dip in Aerial Route Over 144 fiber $75.20
Lash additional cables on new strand $0.14
Traffic control personnel $31.02
Pull up to 144ct armored cable/All sizes micro cable in duct $0.33
Place Armored Fiber in Duct - 288 -432 count $0.80
Bottom package and drive off
99% of poles are accessible from a bucket
Optimal crew size is 4 people per crew with a bucket truck and pickup truck. Crews will be responsible for providing and documenting traffic control as needed.
Estimated completion date August 2022
Current crews completing 3000-7000 ft per day
Please contact us to find out about our partner program, enhanced rates good through 12/31/21.
Below rates are for 1 crew, 30 day pay, enhanced rates for three crews or more are available. Also quicker pay terms are available.
Place 6M strand $0.47
Lash fiber any size on new strand $0.85
Overlash to Existing fiber $0.85
Lash Fiber 432ct $0.94
Place Down Guy for 6M strand (includes Guy Guard) $11.28
Place Screw Anchor – 6000 lbs $42.30
Place Guy Guard (Included in Down Guy) $0.00
Place up to a 4 in. Riser Guard $18.80
Place Aerial Dielectric Self-Supporting cable $0.00
Place Cable extension Arm Long $28.20
Place Cable extension Arm Short / Sidewalk guy arm $23.50
Tree Trimming $28.20
Resag cable $32.90
Delash/relash $0.55
Dead end Pole Transfer $61.10
Straight thru Pole Transfer $42.30
Bonding aerial strand $1.88
Place aerial slack loop coil $32.90
Figure 8 cable for Underground Dip in Aerial Route under 144 fiber $32.90
Figure 8 cable for Underground Dip in Aerial Route Over 144 fiber $75.20
Lash additional cables on new strand $0.14
Traffic control personnel $31.02
Pull up to 144ct armored cable/All sizes micro cable in duct $0.33
Place Armored Fiber in Duct - 288 -432 count $0.80
Contact