Directional Boring Project Near Florabama Line
Independent Contractor
Florida
Perdido Key/Pensacola Near Florabama Line
Starts
Need completed between now and April 12 2021
Pay
Contact to bid
Qualifications
Proper insurance, underground experience, directional bore experience
Other Requirements
Contractor will need to call in necessary locates
Job Description
Looking for insured independent underground contractor to complete the following: Will need 1.5" conduit/roll pipe directional bored from one building to another under an asphalt lot/drive. Distance is approx 140' (one hundred and forty feet). A possible seperate additional 135' plow needed at same location (if crew also does direct bury/plow)-could bore as well if needed. Project location is 1 mile from the Florabama line on the Florida side. This project will need to be complete before Monday April 12th 2021.
Contact
x x x x Canceled/Expired Listing x x x x
listed •
expires
job listing #94857 •
tiny link cabl.co/eyP7