Project Scheduler needed
Full-time Employee
Arizona
Phoenix
Starts
As soon as possible
Pay
Salary is dependent upon experience and qualifications
Qualifications
Must have extensive Oracle Primavera (P6) experience
Job Description
The Planner position is responsible for the planning and scheduling of telecommunication turn-key projects and programs. They gather and analyze information to prepare reports on the progress of projects. They evaluate current procedures and recommend changes to improve the efficiency of planning and scheduling of projects. They must be familiar with a variety of the field's concepts, practices, and procedures. They need to rely on their experience and judgment to plan and accomplish goals. They perform a variety of tasks and may lead and direct the work of others. A wide degree of creativity and latitude is expected. This position may also assist the project manager with other various project related tasks as needed or assigned by the project manager.
Responsibilities:
Create and manage on overall milestone (critical path) schedule which includes all facets of the project development.
Manage the project(s) budgeting process which includes detailed estimate reviews, value engineering, project forecasting and scheduling.
Develop the procurement strategy and identify long lead time items specific to each project.
Work collaboratively with multiple members of the Pre-construction team which may include, Engineers, Project Managers, and Construction teams.
Confers with project staff to outline work plan and to assign duties, responsibilities, and scope of authority.
Effectively manage the document control process and ensure constant communication with the Client and both internal and external Design Team members.
Reviews status reports prepared by project personnel and modifies schedules or plans as required.
Prepares project reports for management, Client, or others.
Confers with project personnel to provide technical advice and to resolve schedule issues.
Develop effective relationships with internally and externally.
Performs other position related duties as assigned by manager.
Qualifications:
Must be proficient in Oracle Primavera (P6)
2-4 years of experience in delivering Outside Plant Telecommunications services or utility related industry
CAPM, PMP or PMI-SP Certification is a plus
Valid Driver’s License
Must be punctual
Must be able to effectively communicate with other employees and vendors
Be available to work overtime and emergencies 24 hours a day, 7 days a week.
Maintain a positive attitude with team and have good work ethics.
Maintain good public relations (interact with the public in a courteous manner)
Must have reliable transportation to and from work
Must be able to meet various types of deadlines to meet customer needs
Must be able to multi task, be patient, and helpful to team members as needed
Must have a good working relationship with field and managers
Must be able to pass company drug screen and background process
Duties outlined in this position will require the employee to stand, crouch, sit, bend, use hands and fingers to handle or feel as well as reaching with hands and arms to spaces both high and low. The employee will be standing, walking, climbing, balancing, crawling, crouching, lifting, holding or stooping while on shift.
The noise level in the work environment for this position is low.
Employees performing these job functions may be required to lift or move up to 50 pounds in a shift
Specific vision abilities required to perform this job include but are not limited to: close vision, distance vision, color vision, peripheral vision, depth perception and the ability to adjust focus potentially near and/or far as needed.
Responsibilities:
Create and manage on overall milestone (critical path) schedule which includes all facets of the project development.
Manage the project(s) budgeting process which includes detailed estimate reviews, value engineering, project forecasting and scheduling.
Develop the procurement strategy and identify long lead time items specific to each project.
Work collaboratively with multiple members of the Pre-construction team which may include, Engineers, Project Managers, and Construction teams.
Confers with project staff to outline work plan and to assign duties, responsibilities, and scope of authority.
Effectively manage the document control process and ensure constant communication with the Client and both internal and external Design Team members.
Reviews status reports prepared by project personnel and modifies schedules or plans as required.
Prepares project reports for management, Client, or others.
Confers with project personnel to provide technical advice and to resolve schedule issues.
Develop effective relationships with internally and externally.
Performs other position related duties as assigned by manager.
Qualifications:
Must be proficient in Oracle Primavera (P6)
2-4 years of experience in delivering Outside Plant Telecommunications services or utility related industry
CAPM, PMP or PMI-SP Certification is a plus
Valid Driver’s License
Must be punctual
Must be able to effectively communicate with other employees and vendors
Be available to work overtime and emergencies 24 hours a day, 7 days a week.
Maintain a positive attitude with team and have good work ethics.
Maintain good public relations (interact with the public in a courteous manner)
Must have reliable transportation to and from work
Must be able to meet various types of deadlines to meet customer needs
Must be able to multi task, be patient, and helpful to team members as needed
Must have a good working relationship with field and managers
Must be able to pass company drug screen and background process
Duties outlined in this position will require the employee to stand, crouch, sit, bend, use hands and fingers to handle or feel as well as reaching with hands and arms to spaces both high and low. The employee will be standing, walking, climbing, balancing, crawling, crouching, lifting, holding or stooping while on shift.
The noise level in the work environment for this position is low.
Employees performing these job functions may be required to lift or move up to 50 pounds in a shift
Specific vision abilities required to perform this job include but are not limited to: close vision, distance vision, color vision, peripheral vision, depth perception and the ability to adjust focus potentially near and/or far as needed.
Contact
x x x x Canceled/Expired Listing x x x x
listed •
expires
job listing #85911 •
tiny link cabl.co/ewvP
