Create your free account now! Sign up

Directional Drill Subcontractor

Independent Contractor


Kentucky

Bowling Green and Auburn area

Starts

ASAP. As soon as 6/7/2019.

Pay

Rock Drilling $60.00 per ft. Dirt Drilling $8.00 per ft.

Qualifications

Subcontractor will need to submit all the necessary paperwork including 282 forms. The subcontractor must be insured. You must have all the necessary equipment and tools to get the job done on time.

Job Description


Contact

x x x x Canceled/Expired Listing x x x x

listed • expires
job listing #82258 • tiny link cabl.co/evyU