Drilling In Washington 14 day payments 13.27 +

Contractor: Corp-to-Corp


Washington

Seattle Washington

Starts

ASAP

Pay

Directional bore pull back two 2 inch ducts 13.27 per ft. Install boxes priced each. Hard surface pot hole restore 127.40 each. Asphalt restoration 12.01 per sq ft, concrete restoration 11.03 per sq ft, import fill 56.50 per ton.

Other Requirements

Drill and support equipment

Job Description

Directional bore pull back two 2 inch conduits. Install vaults. Hard surface restore.