Drilling In Washington 14 day payments 13.27 +
Contractor: Corp-to-Corp
Washington
Seattle Washington
Starts
ASAP
Pay
Directional bore pull back two 2 inch ducts 13.27 per ft. Install boxes priced each. Hard surface pot hole restore 127.40 each. Asphalt restoration 12.01 per sq ft, concrete restoration 11.03 per sq ft, import fill 56.50 per ton.
Other Requirements
Drill and support equipment
Job Description
Directional bore pull back two 2 inch conduits. Install vaults. Hard surface restore.
Contact
x x x x Canceled/Expired Listing x x x x
listed •
expires
job listing #52253 •
tiny link cabl.co/enKX
