Fiber u.g. placement
Contractor: Corp-to-Corp
Texas
central Texas
Starts
Fiber and permits are ready for 4 reels, remaining permits are being approved. Need to start ASAP
Pay
PLease call for pricing.
Qualifications
Must have extensive knowledge of pulling/blowing large count ribbon fiber through innerduct. Cable is 1" in diameter pulling through 1 1/4" sdr 11. Reel sizes are 20,000' with no cuts. looking at 40 miles left. Spans are roughly 1000' between MH's.
Other Requirements
Must have all blowers, assist wheels, trucks, trailers, etc. Must provide Insurance and get Bonded with the city.
Job Description
Install 432 ct ribbon fiber through 1 1/4" sdr-11 roll pipe. Fiber has been pulling hard so only experienced large count fiber pulling/blowing companies respond please. All traffic control will be supplied by us.
Contact
x x x x Canceled/Expired Listing x x x x
listed •
expires
job listing #34879 •
tiny link cabl.co/ejeJ
