Drill Crews
Independent Contractor
California
Clear Lake and Larkport california
Starts
Immediately after onboarding
Pay
$12 Composite Rate, which includes Bore, pulling 1 or 2 1''5 conduit and setting up structures, installing Ground Rods. Rock Adder is a separate rate @ $7.50, Fiber Pulling @ $1.50. Net30 or Net14 Factoring @ 3% Based on QC and Approved work.
Qualifications
Experience drill operator, Locator and crews, that can do good work and restore excavated ground.
Other Requirements
Only Experienced and reliable Crews,
Job Description
JT24 Drill Rigs or larger needed for this project, 20,000 Linear footages to bore by the end of October 2026, Hydrovac must be in place to vac and expose utilities before crossing it. 48inches of depth must be maintained for a bore path and for all Road crossing no exceptions, otherwise communicated and approved by the Construction Manager. Utility signs and Cones must be provided by the crew and used at all times when drilling crews are on site.
This is all Rural FTTH Directional Drill Operations.
This is all Rural FTTH Directional Drill Operations.
Contact
760-987-6135
443-760-6475
443-760-6475
Please Login to use the Contact form.
listed •
expires
job listing #130191 •
tiny link cabl.co/eH11