Need Drop Crews in Wylie, TX Net 6 Pay
Independent Contractor
Texas
Need Drop Crews in Dallas, Wiley and Surrounding Area
Starts
Immediately Once Onboarded
Pay
Piece Rate, Crews Averaging $2,500-$4,600 depending on tools and ability. Pay is net 6 / Weekly Direct Deposit
Qualifications
Safety first mindset, Experience in drops a must, Ability to bore at least SW and DW a must. Make sure that you have all tools required to do the job safely and efficiently. Womper, Shovels, Rakes, Tamper, Drill / Flexbits for SW, Missile, Stick bore or other legitimate means for DW and Road Bores, EZ Trencher or Plow a plus but not required.
Other Requirements
Truck, Van, SUV, Light Meter, Cones and Safety Gear
Job Description
A dozen new sub divisions w new fiber build being released for installation, We need to get all the drops buried. This is a beautiful area and we are looking for crews that understand how to do clean work and leave the property looking like we were never there. Crews that take pride in their work and being the best at what they do. We have a heavy management prescience onsite and QC 100% of jobs so poor craftsmanship will be caught immediately and crews wont last. We are seeking experienced drop bury techs capable of completing driveway, and sidewalk bores. Applicants must have all necessary tools or be willing to purchase them. Tools include Womper, Shovels, Rakes, Drills and Flex Bits etc to efficiently complete drop bury jobs from start to finish. If you are inexperienced, we are willing to train the right people, must have passion, energy and drive. Pay is per drop, techs are averaging $2,500-$4,600 a week, with some doing much higher than that. Safety is key and we are looking for Men and Woman that work safely, efficiently while driven and want to make money.
Stackable Codes
B026 Drop Removal EA $12.00
B028 Cutover Plug and Play EA $6.00
B71A Trip Charge EA $19.20
BD03 DW / SW Bore Per Ft $4.31
BD04 Pull Through empty Conduit Per Ft $0.26
BD07 Direct Bury Fiber Drop Per ft $ 0.53
BD13 Pull Through Occupied Conduit Adder per Ft $0.08
P59F Road Bore Per ft $8.21
P71D Expedited Drop Request EA $14.40
Stackable Codes
B026 Drop Removal EA $12.00
B028 Cutover Plug and Play EA $6.00
B71A Trip Charge EA $19.20
BD03 DW / SW Bore Per Ft $4.31
BD04 Pull Through empty Conduit Per Ft $0.26
BD07 Direct Bury Fiber Drop Per ft $ 0.53
BD13 Pull Through Occupied Conduit Adder per Ft $0.08
P59F Road Bore Per ft $8.21
P71D Expedited Drop Request EA $14.40
Contact
x x x x Canceled/Expired Listing x x x x
listed •
expires
job listing #124167 •
tiny link cabl.co/eGsR
