Colorado New Build. Tons of Footage Good Price
Independent Contractor
Colorado
North Park
Starts
Aerial Work Begins April 1st. UG work Begins April 15th
Pay
Non Composite Piece Rate
Job Description
Aerial Work. MUST CLIMB. This work does have some bucket work available esp if you have a placer, but a lot of this work has to be climbed. If you can not climb do not waste your time. Right now we have about 850k of work and material in hand. This work is very rural so resembles Rdof Spans 250+. Starts a 1.00 a ft and goes up with exp and proven capability.
UG. ATM we have just under 200k ft of maps and material in hand. We are looking to bring only 2 or 3 drill in atm. Must be able to call in own locates and MUST BE ABLE to drill in rock. 50/50 rock to soft ground so if you cant dont waste your time. New company so as we move down the mountain a lot more footage to come. Non Composite pay as well.
UG. ATM we have just under 200k ft of maps and material in hand. We are looking to bring only 2 or 3 drill in atm. Must be able to call in own locates and MUST BE ABLE to drill in rock. 50/50 rock to soft ground so if you cant dont waste your time. New company so as we move down the mountain a lot more footage to come. Non Composite pay as well.
Contact
502-650-6376 Brandon
Please Login to use the Contact form.
About Us
Donis Solutions
listed •
expires
job listing #121885 •
tiny link cabl.co/eFR3