Create your free account now! Sign up

Colorado New Build. Tons of Footage Good Price

Independent Contractor


Colorado

North Park

Starts

Aerial Work Begins April 1st. UG work Begins April 15th

Pay

Non Composite Piece Rate

Job Description

Aerial Work. MUST CLIMB. This work does have some bucket work available esp if you have a placer, but a lot of this work has to be climbed. If you can not climb do not waste your time. Right now we have about 850k of work and material in hand. This work is very rural so resembles Rdof Spans 250+. Starts a 1.00 a ft and goes up with exp and proven capability.

UG. ATM we have just under 200k ft of maps and material in hand. We are looking to bring only 2 or 3 drill in atm. Must be able to call in own locates and MUST BE ABLE to drill in rock. 50/50 rock to soft ground so if you cant dont waste your time. New company so as we move down the mountain a lot more footage to come. Non Composite pay as well.

Contact

502-650-6376 Brandon

Please Login to use the Contact form.

About Us

Donis Solutions

listed • expires
job listing #121885 • tiny link cabl.co/eFR3