Create your free account now! Sign up

Directional Drilling San Antonio

Contractor: Corp-to-Corp


Texas

San Antonio

Starts

As soon as onboarding is complete

Pay

Rates will be disclosed upon interview.

Qualifications

Contractor will need to be able to provide some references of past projects. Must be able to work around existing utilitize without damaging them. Disruption of marked utilitize will not be acceptable.

Other Requirements

Directional drills with at least 10,000 lbs of thrust will be required. JT20 or 23x30DR are preferred as we are placing the conduit on the back of the ROW. We are placing micro duct typically (3) 18mm micro ducts (18" cover required.) We are working in close proximity to existing plant. Please note: Hydrovac will be required. The fibers that we will expose are direct buried micro fibers meaning, they are very delicate and easy to damage by shovel. Hydrovacing will be fully enforced.

Job Description

Safely and Responsibly install underground plant as shown in the design. This will involve exposing all marked utilitize in the bore pathway, prior to initiating the drill. Working closely with our supervisors and following protocol is of tremendous importance. Placement of Small Vaults and drop vaults will be part of the work.

Contact

x x x x Canceled/Expired Listing x x x x

listed • expires
job listing #121002 • tiny link cabl.co/eFDO