CIC Bury Crews needed Miami or Fort Meyer
Independent Contractor
Florida
Fort Meyer
Starts
ASAP after passing Background and Drug Test
Pay
Text for rates
Qualifications
Bury machine or Hand bury equipment , and all necessary equipment to complete Bore.
Job Description
Pictures uploaded to QC site
CIC attached to the wall with 2 clips and touching or inside of the wall box
CIC 6-8 inches inside of the Ped
Both side of conduit sealed with silicone or tape
Levels recorded and written on a tag and placed inside the wall box.
(CIC) Cable in conduit
CIC attached to the wall with 2 clips and touching or inside of the wall box
CIC 6-8 inches inside of the Ped
Both side of conduit sealed with silicone or tape
Levels recorded and written on a tag and placed inside the wall box.
(CIC) Cable in conduit
Contact
x x x x Canceled/Expired Listing x x x x
listed •
expires
job listing #118043 •
tiny link cabl.co/eER5