IDAHO FTTH Drop Project - Direct Bury Per Ft Rate
Contractor: Corp-to-Corp
Idaho
Boise
Starts
1-1-2024
Pay
Line item for pricing to including Direct Bury Footage, Placing Drop in Existing Conduit, Placing Conduit, and Boring
Qualifications
Looking for crews with 2 years experience on previous FTTH projects.
Other Requirements
Crews will need to own plows capable of plowing at a 12" depth and ability to bore sidewalks/driveways. A rodder is also recommended.
Job Description
The project consists of direct burying fiber drops (machine/hand dig) at a 12 inch depth to include boring sidewalks and driveways. This will also require the ability to pull drops through existing conduit.
This is a year round 5 year project with steady workflow.
This is a year round 5 year project with steady workflow.
Contact
x x x x Canceled/Expired Listing x x x x
listed •
expires
job listing #115650 •
tiny link cabl.co/eEfu