Create your free account now! Sign up

IDAHO FTTH Drop Project - Direct Bury Per Ft Rate

Contractor: Corp-to-Corp


Idaho

Boise

Starts

1-1-2024

Pay

Line item for pricing to including Direct Bury Footage, Placing Drop in Existing Conduit, Placing Conduit, and Boring

Qualifications

Looking for crews with 2 years experience on previous FTTH projects.

Other Requirements

Crews will need to own plows capable of plowing at a 12" depth and ability to bore sidewalks/driveways. A rodder is also recommended.

Job Description

The project consists of direct burying fiber drops (machine/hand dig) at a 12 inch depth to include boring sidewalks and driveways. This will also require the ability to pull drops through existing conduit.

This is a year round 5 year project with steady workflow.

Contact

x x x x Canceled/Expired Listing x x x x

listed • expires
job listing #115650 • tiny link cabl.co/eEfu