Create your free account now! Sign up

2,500 Aerial Drops

Contractor: Corp-to-Corp


Connecticut

Starts

3/23/23

Pay

$24 per span

Qualifications

COI

Other Requirements

truck ladder PPE

Job Description

2 Fiber, connectorized drops, no splicing, average 35 foot spans, average of 2.5 spans per drop. Use new or existing J-Hooks and Span Clamps to connect at/on poles and Ram's Head at premise. Slack loop at each pole 6" diameter 2 loops each. Ladder accessible. Communications Infrastructure is PRIME on this project.

Contact

x x x x Canceled/Expired Listing x x x x

listed • expires
job listing #110902 • tiny link cabl.co/eC0U