2,500 Aerial Drops
Contractor: Corp-to-Corp
Connecticut
Starts
3/23/23
Pay
$24 per span
Qualifications
COI
Other Requirements
truck ladder PPE
Job Description
2 Fiber, connectorized drops, no splicing, average 35 foot spans, average of 2.5 spans per drop. Use new or existing J-Hooks and Span Clamps to connect at/on poles and Ram's Head at premise. Slack loop at each pole 6" diameter 2 loops each. Ladder accessible. Communications Infrastructure is PRIME on this project.
Contact
x x x x Canceled/Expired Listing x x x x
listed •
expires
job listing #110902 •
tiny link cabl.co/eC0U