Job Description

We are in the beginning phase of a multi-year project in Central Florida. We are looking to bring on a few missile and drill crews. You will be required to place 2” and 4” pipe as well as handholes. The 2” pipe you can bill separately for the mule tape installation however it is included in the price of the 4”. Pay is 30 days past invoice.

• Responsible to call in your own locates in accordance with State and local laws
• Must be able to maintain strong performance metrics on quality control, avoid damages to include but not limited to customer’s and client properties.
• Carry out all work performed in the safest possible manner, following all OHSA and industry safety guidelines and requirements
*must have responsible crew leader onsite at all times
**Extremely safety minded **

BM60(1.25)2PD-L Bore 2 - 1.25" Plastic Pipe Directional Bore $4.47
BM60(1.25)2PD-ROCK-L Bore 2 - 1.25" Plastic Pipe Directional Bore - Rock $34.51
BM60(1.25)P-L Bore 1.25" Plastic Pipe $3.25
BM60(1.25)PD-L Bore 1.25" Plastic Pipe Directional Bore $3.25
BM60(2&4)PD-L Bore 2" & 4" Plastic Pipe Directional Bore $8.93
BM60(2)-L Bore 2" Steel Pipe $4.47
BM60(2)2PD-L Bore 2 - 2" Plastic Pipe Directional Bore $5.68
BM60(2)P-L Bore 2" Plastic Pipe $4.06
BM60(2)PD-L Bore 2" Plastic Pipe Directional Bore $4.06
BM60E-L locate and dig up both ends of existing BM60 AND CLEAN THE DUCT AND RESESAL AFTER CABLE IA PLACED. INCLUDES THE LOCATING AND CLEARING OF CUSTOMER OWED CONDUIT TO PULL A CABLE THROUGH IT $81.20
BM72-L Remove & Restore Asphalt per Lineal FT $9.74
BM72-R1-L Remove & Restore Asphalt per SQ FT Less Than 6" Thick $4.82
BM72-R2-L Remove & Restore Asphalt per SQ FT Greater Than 6" Thick $9.56
BM72-TMP-L Place and maintain Temporary Asphalt Patch $4.87
BM72A-L Remove & Restore Asphalt per SQ FT $4.87
BM72A(12)-L Remove & Restore Asphalt per SQ FT to a depth of 6" to 12" $7.31
BM72A(18)-L Remove & Restore Asphalt per SQ FT to a depth of 13" to 18" $9.74
BM73-L Remove & Restore Concrete per Lineal FT $9.42
BM73-P-L Concrete Pad per SQ FT 6" Thick $3.05
BM73-R1-L Remove & Restore Concrete per SQ FT Less Than 6" Thick $7.47
BM73-R2-L Remove & Restore Concrete per SQ FT Greater Than 6" Thick $14.94
BM73A-L Remove & Restore Concrete per SQ FT $4.70
BM74-L Place One Cubic Yard of Gravel $14.21
BM74(C)-L Place One Cubic Yard of Slurry Mix $60.90
PFTTX-BDO4-L Place Pedestal 8 inch - Placing $18.98
PFTTX-BDO4-H-L Place Pedestal 8 inch Handhole Mount - Placing $18.98
PFTTX-BDO5-L Place Pedestal 10 inch - Placing $25.68
PFTTX-BDO5-SS-L Place Pedestal 10 inch with Slack Storage - Placing $25.68
PHUSO(11.5X30)D36G-L Underground Fiber Sealed Splice Closure-Placing $59.18
PHUSO(9.8X24)BG-L Underground Fiber Sealed Splice Closure - Placing $59.18
PM100 (2)-L Core bore 2" HOLE IN A CONCRETE FLOOR OR WALL IN A BUILDING $58.40
PM100 (3)-L Core bore 3" HOLE IN A CONCRETE FLOOR OR WALL IN A BUILDING $71.05
PM100 (4)-L Core Bore 4" HOLE IN A CONCRETE FLOOR OR WALL IN A BUILDING $77.14
T&E 2 MAN CREW-L Crew rate includes a backhoe, full COMPLEMENT OF TOOLS AND EQUIP INCLUDING TR & TR $34.51
T&E 3 MAN CREW-L Crew rate includes a backhoe, full COMPLEMENT OF TOOLS AND EQUIP INCLUDING TR & TR $54.81
T&E 4 MAN CREW-L Crew rate includes a backhoe, full COMPLEMENT OF TOOLS AND EQUIP INCLUDING TR & TR $60.90
TRIP CHARGE CONST CREW-L TRIP CHARGE CONST CREW -- LABOR ONLY FOR AN EMERGENCY TRIP CHARGE FOR A BURIED CREW AND EXCLUDES ANY WORK DONE AT JOB SITE $20.30
UD(1X1-1.25)-L Trench 1-1.25" Conduit $1.52
UD(1X1-2)-L Trench 1 - 2" Conduit $1.52
UD(1X1-3)-L Trench 1-3" Conduit $1.93
BFO96T-L Trench FIBER Cable 30" Depth $1.06
BM60(4)PD-L Bore 4" Plastic Pipe Directional Bore $6.06
BM60(4)PD-ROCK-L Bore 4" Plastic Pipe Directional Bore - Rock $15.40
BM60(2)PD-ROCK-L Bore 2" Plastic Pipe Directional Bore - Rock $11.20
BM71-A-L Rock Excavation $7.00
BHF(48X72X48)-L Handhole $304.50
BFV(1)(1.25)T-L Trench 1.25" Duct $1.83
BFV(1)(2)T-L Trench 2" Duct $1.83
BFV(1)(4)T-L Trench 4" Duct $3.05
BFV(2)(1.25)T-L Trench 2 - 1.25" Ducts $2.56
BHF(24X36X24)-L Handhole $111.65
BHF(30X48X36)-L Handhole $182.70