BORE Pennsylvania Deployment $ Hotel Incentive $
Contractor: Corp-to-Corp
Pennsylvania
Starts
9-6-22
Pay
Dirt 1-1.25" $8.25/Ft Cobble 1-1.25" $22/Ft Rock 1-1.25" $60/Ft Fiber Placement $.60/Ft FlowerPot $50ea 2x3HH $250ea Pedestal $65ea Muletape Placement Required & Included in Price. $3000 Deployment Bonus. Potential for Partial Hotel Payment upon
Qualifications
Insurance
Other Requirements
Need full bore crew. Pothole, Mini Ex, Drill. Handhole placement and fiber pull (if capable) Muletape if not. Materials provided - Conduit/Fiber/Handholes/Muletape. You must pick up materials at yard in Birdsboro PA.
Job Description
300 Miles UG Fiber to Premise Project in Pennsylvania. We are PRIME. Deployment Bonus payable upon 2,000' of inspected billable production. Potential for Hotel Partial Payment if production quotas are met. Directional drill in ROW. 90% front easement. Place qty (1) 1.25" conduit, proof & place Muletape. Place 2x3 handhole . Pull fiber (separate billable unit per foot). All permits in place. Must site existing utilities before drilling. Water Provided, Muck Dumpsite Provided. Project management & locate field support. Come Partner with a true partner who wants to see you succeed. Current bore area is butter dirt with 2% rock.
Contact
x x x x Canceled/Expired Listing x x x x
listed •
expires
job listing #106285 •
tiny link cabl.co/eBOr
