Joseph Orsino Jr.
107 Brinkley Dr.
Sellersville PA 18960
1-215 453-7365
E mail Address:  (-REDACTED-)  
OBJECTIVE:
To obtain a supervisory or management position which allows me to utilize my extensive background and experience in modern CATV network plant and equipment.
 
SUMMARY:
Proven manager with 16 years experience in all fields related to the development of both new and existing CATV network. 
EXPERIENCE:
RCN, Westwood, MA						October 2000 - February 2001
Project Coordinator 
* Supervised new network builds for MDU's including pre-walkouts with contractors and property managers/building owners. 
* Interfaced  with involved parties on build-out specifications. Worked with in-house CAD for correct RF design.
* Prepared and successfully presented engineering build-outs for approval.
* Solicited proposals from multiple vendors. Reviewed bids and issued contracts. 
* Coordinated multiple vendors/projects from initial engineering through activation.
* Obtained all required permits. Reviewed and approved all BOM's. 
* Accountable for quality control of all construction including main underground & aerial feeds to the property.
Documented all project particulars. Prepared final as-built package in both  
electronic (PC) 
and paper formats.
Eastern Communications Corporation, Marshfield, MA	        March 2000 - October 2000
Make- Ready Manager
* Worked directly with Boston Edison on all make-ready issues relative to the regional 
development of a new fiber optic network.
* Interfaced with high level utility personnel. Provided instruction on technical issues of 
CATV  aerial specifications relative to interference and other performance criteria.    
* Prepared work orders to utility company to correct all issues relative to make ready.  
Orders included movement of secondary power cables, transformers, racks and placement of 
other specialized equipment.    
* Directed follow-up inspection of all utility company work orders. Responsible for final QC. 
QC Inspector- Grade 2
* Daily inspection of all strand and coax installation to ensure construction according to 
industry standard specifications.
* Verify and enforce safety practices of all sub contractors.
* Document and generate as-built package for strand and coax design.
Joseph Orsino Jr.										        Page 2
Time Warner Communications- St. Petersburg, FL		        April 1999 - February 2000
Assistant Project Manager
* Solicited bids, negotiated and issued contracts with multiple construction companies.
* Approved all material requisition and work order forms. 
* Assured all required permits were acquired prior to construction starting.
* Managed all underground construction to D.O.T. & Time Warner specifications including 
Directional Boring, Missile Boring or Hand Trenching.
* Supervised all aspects of work performed. Assured rigid company standards were met prior 
to completion and close out of each project.  
* Assumed full fiscal responsibility for project completion within Time Warner budgetary 
guidelines- the strictest in the CATV industry.
* Performed employee reviews of all Time Warner QC Inspectors on a quarterly basis.  
U.S.A. Communications & Cable, Tampa FL			       September 1998 - March 1999
Director Of Underground & Aerial Construction (MDU's)
Directed all U.S.A. Communications sub-contractors performance relevant to 
stringent standards as outlined in Time Warner Work Orders.
* Reviewed work order requirements.
* Directed all underground and aerial construction following D.O.T. and OSHA rules and 
regulations. 
* Approved as-builts upon project completion.
* Reviewed all invoicing of work for payment from Time Warner.
* Authorized production and payroll expenses for all sub-contractors.
Time Warner Communications, Tampa, FL.			        April 1997 - August 1998
Field Engineer 
* Engineer fiber-optic upgrade, including strand mapping and plotting of new design.
* Q.C. existing underground plant
* Q.C. existing aerial plant
Time Warner Cable, New York, NY				        January 1987 - April 1997 
Journeyman Cable Construction Worker (May 1995-April 1997)
Coordinated a 900 sq. mile upgrade rebuild to a Fiber-Optic 1 GHZ system that included 
changing, balancing and splicing all Gerald Instruments Equipment including:
* Amplifiers (mini bridges-JLX-XQLE-MXQ).
* Inblock cable and all passive equipment.
* Building feeder cables.
* MDU rewires (Telco, Hallway Homeruns-Conduit HRS and Hallway TAP).
* Electrical power supplies.
Cable Construction Apprentice- Level 4 (March 1993 - April 1995) 
* Performed new installations of a 550 MHZ System. Provided maintenance service while 
changing existing customers to the new platform.
Cable Construction Apprentice- Level 3  (January 1987 - February 1993) 
Assisted  with and completed a 900 square mile upgrade rebuild from a 350 MHZ to a 550 MHZ 
system.  Including but not limited to the following equipment from various manufacturers:
* Amplifiers (MXQ-XQLE-L.E.).
* Inblock cable and all passive equipment.
* Builder feeder cables.
REFERENCES: 	Furnished upon request 	
    