Re:NEED 50 PEOPLE FOR MDU PROJECT IN DAYTON OHIO
                Member #: 4422
            
            
                Registered: 1996-2001
            
            
                Posted:
                
                    60 
                
            
                
                    Name:
                    Mike Coffman
                
                            
                    Name:
                    Mike Coffman
                
                
                    Company:
                    Coffman Fiber and Cable Services Inc.
                
                            
                    Occupation:
                    Director of Operations
                
                            
                    Location:
                    Winchester, Ky
                
                            
                    Personal:
                        
                    mid 60s
                
                            
                    Experience:
                    ~47 years
                
        you need to put this on in house jobs your price list is not from the prime
>I NEED 50 QUALITY PEOPLE FOR A LONG TERM PROJECT IN DAYTON OHIO. PROJECT EXPECTED TO LAST ANOTHER YEAR. AVE. PAY IS 1500 TO 2200 A WEEK PAY IS TWO WEEKS OUT FROM INVOICE SO IT WILL BE THREE WEEKS B4 THE FIRST CHECK THEN A CHECK EVERY WEEK. PAY RAISE AFTER 90 DAYS NO RETAINAGE. 100% Q.C. WORK READY NOW
>CALL 678-794-2991. EMAIL ME AT (-REDACTED-)
>
>PRICES AS FOLLOWS:Post wire to point of entry $13.50
>Install RG-6 House drops from pole to building up to 100' $15.75
>Install RG-6 House drops each additional foot over 100' $0.16
>Ground Blocks $3.00
>Trench (24" depth) $1.25
>Install New Drop Fittings $0.68
>Install Drop Splitters $0.75
>Extend Drops On building (to 10') $3.38
>Install Moldings on building (to 2") $0.68
>Rework molding on building (to 2") $0.68
>Rework Metal moldings (to 2") $1.13
>Splice System amplifier $81.00
>Splice System Line Extender $64.50
>Splice Passive Splitting Device $24.75
>Splice Directional Tap $10.13
>Straight Splice $10.13
>Install VGR or Ground Rod $12.60
>Install Small LockBox (drop Splitters) $20.25
>Install Medium Lockbox $24.75
>Install Large Lockbox $46.88
>Repair / Replace Lockbox Cover
>Install Tom Ped $93.75
>Install Large Pedestal $24.75
>Install Medium Pedestal $9.90
>Install Small Pedestal $6.75
>Remove Replace Small Pedestal $9.00
>Remove Replace Medium Pedestal $12.15
>Remove Replace Large Pedestal $29.25
>Install Self Support Feeder $0.68
>Building Attachment Brackets $5.40
>Core Drill Hole (by diameter in inches) $2.70
>Wreckout Aerial Drops $0.56
>Wreckout Pedestal $3.38
>Wreckout Small Lockbox $5.40
>Wreckout Medium Lockbox $8.10
>Wreckout Large Lockbox $9.90
>Wreckout Taps $1.35
>Wreckout LE/Splitter/DC $2.70
>Wreckout Trunk Amp $4.05
>Wreckout Aerial Self Support Feeder $1.01
>Additional items/Hourly Installer/Technician $11.25
>
>
>
>
        This is CABL.com posting #54361. Tiny Link: cabl.co/moiX
    
    
            There is 1 reply to this message
        
            
    
 
            