i get 150 per drop up to the 1st 150 ft. then 75 cents per foot after that and thats direct bury, i get 2.00 per foot on 3\4 inch conduit with a 75 ft minimum billed and thats all at 12 " deep. 800 per vault\hand hole. 4.00 per foot for conduit at 24 "
my price sheet is 2 pages long and there is a price for everything... if you want me to spit in the customers face and piss on his door step i have a price on there for that too
Re: Network Drop certification rates.
Member #: 109454
Registered: 4/4/2017
Posted:
33
Name:
J...Lawless
Name:
J. Lawless
Company:
Lawless Underground LLC
Occupation:
drops and hardline
Location:
iowa
Personal:
40-ish
Experience:
~21 years
This is CABL.com posting #373524. Tiny Link: cabl.co/mbJkK
Posted in reply to: Network Drop certification rates. by sbp37388
There are 0 replies to this message