so true//you must plan the run . Since I work for a utility company that thinks every damn trailer should wiegh a ton. When I do coax I just load em on the backbar and breakout my old faithful jack-stands. So much quicker. I believe in a good tight set-up.
just an old lineman//grew up with a sawdust pumper in between my belt.
chased a 1 ton for years
run a T40-C(PRO)//I actually know how to operate it. never could figure out that sawdust pumper//he//he
This is CABL.com posting #140893. Tiny Link: cabl.co/mKOD