Fiber Puller/Blower/Jet Crews Needed-3yrs Work
Contractor: Corp-to-Corp
Alabama
Birmingham, AL
Starts
3-4 Weeks
Pay
Competitive
Job Description
Responsibilities:
Pull fiber after vaults and pedestals are in place
Tag fiber
Capable of reading blueprints
6 months in commercial structured cabling, pulling wires (Cat 5/6 & Fiber), dressing cables and hanging j-hooks
Ability to follow wiring schematics
Strong organizational skills
Scope of Work:
Total miles 900 fiber optic construction 450 miles Aerial work and 450 miles Underground “One Fiber Initiative” in the Birmingham Urban Area Code Entity. Backbone/Core build. Construction Services will be the safe operation of equipment, handling of materials and the installation of underground, aerial and inside plant infrastructure, access points, conduit, inner-duct, micro-duct, cable, pullboxes, attachments and associated hardware, strand, markers, risers, guys, cable prep, splicing, fiber testing, traffic control and restoration of all affected areas to produce a quality fiber optic cable network for Verizon’s One Fiber Initiative. 5/16 Strand and Fiber size up to 432 and 864ct. Metro and surrounding area 100% new build. Point to Point system. ribbonized, cabinets. 36 in depth.
Pull fiber after vaults and pedestals are in place
Tag fiber
Capable of reading blueprints
6 months in commercial structured cabling, pulling wires (Cat 5/6 & Fiber), dressing cables and hanging j-hooks
Ability to follow wiring schematics
Strong organizational skills
Scope of Work:
Total miles 900 fiber optic construction 450 miles Aerial work and 450 miles Underground “One Fiber Initiative” in the Birmingham Urban Area Code Entity. Backbone/Core build. Construction Services will be the safe operation of equipment, handling of materials and the installation of underground, aerial and inside plant infrastructure, access points, conduit, inner-duct, micro-duct, cable, pullboxes, attachments and associated hardware, strand, markers, risers, guys, cable prep, splicing, fiber testing, traffic control and restoration of all affected areas to produce a quality fiber optic cable network for Verizon’s One Fiber Initiative. 5/16 Strand and Fiber size up to 432 and 864ct. Metro and surrounding area 100% new build. Point to Point system. ribbonized, cabinets. 36 in depth.
Contact
x x x x Canceled/Expired Listing x x x x
listed •
expires
job listing #80320 •
tiny link cabl.co/eu3E