In Reply to message #375244 by Dave1818
Journeyman Member TSBCCC is not online, or is invisible.
1/12/2018 7:21:08 PM
TSBCCC Member #: 44560 Registered: 2/21/2006
Posted: 44 View all posts by TSBCCC
Occupation: Engineer Location: South Dakota
Re: Aerial cable leasing and overlashing
You didn’t mention 2 of the most important obstacles, Street side/alley vs easement and how bad are the trees. It also depends on number of; 90s, underground dips, places to figure 8, mid span bugnuts, mid span drops, fences, mean dogs, mean people, stupid people, warehouse location and traffic/traffic control. 

That at said a good 3 man crew could finish as little as 1200 to 5000 feet a day. I know this is a big window but it is as close as I can give you with the info I have. 