Re: What to do when a tech holds equipment for ran
That is where it should be!
IF there are QC problems there SHOULD have been a do over list with a completion date.
LIKEWISE, short or late checks should be presented for adjustment.
THEN the final check is presented. IF it bounces that is a seperate crime. Then equipment inventory is presented and checked. Both parties hug (optional) and march in seperate directions.
Joe
joe
This is CABL.com posting
#359461. Tiny Link:
cabl.co/mbFFV
This member is a Regular Member.