In Reply to message #359456 by massive coax
Member Member EshoreJoe is not online, or is invisible.
12/21/2013 5:58:59 PM
EshoreJoe Member #: 66409 Registered: 2/26/2009
Posted: 985 View all posts by EshoreJoe
Company: phone & dtv contractor Occupation: installer Location: east MD
Re: What to do when a tech holds equipment for ran
That is where it should be!

IF there are QC problems there SHOULD have been a do over list with a completion date.

LIKEWISE, short or late checks should be presented for adjustment.

THEN the final check is presented. IF it bounces that is a seperate crime. Then equipment inventory is presented and checked. Both parties hug (optional) and march in seperate directions.

Joe
joe This member is a Regular Member.